午夜精品久久久久久久2023-午夜精品久久久久久久90蜜桃-午夜精品久久久久久久99-午夜精品久久久久久久99热-午夜精品久久久久久久99热浪潮-午夜精品久久久久久久第一页

Silk mouth backflow preventer

Products > Hydraulic control valve > Silk mouth backflow preventer

Silk mouth backflow preventer

Model: HS11X-16T
Nominal diameter: DN40 ~ 100mm
Nominal pressure: PN1.0 ~ 1.6MPa
Suitable temperature: 0 ~ 80 ℃ (if necessary, up to 200 ℃)
Flange standard: GB / T17241.6, GB / T9113
Test standards: GB / T 13927, API598
Contact purchase
shared:

First, the product description:
 HS11X-16T silk mouth backflow preventer is to repair the pipeline and power, the tap water is often interrupted, once the power supply is restored, tap water becomes yellow and dirty, it is due to the process of water, from the fire pipe , Unoccupied buildings or water pipes have not yet used the branch of the backwater, rust water back. In order to allow residents to drink clean water, backflow preventer this device can effectively prevent the occurrence of dirty water in the above circumstances, not only ensure the safety of residents drinking water, but also save water resources. According to the introduction of China Building Standard Design Institute, the Ministry of Construction has revised the relevant national standards and installed "backflow preventer" on the building water supply pipelines.  


 Second, the product structure:
 Backflow prevention device is composed of two levels of back-stop system and a drainage pressure relief system. The drainage pressure relief system upper chamber is connected with the inlet end of the first-stage check-back system. 
 The first and second-level check-back system is mainly composed of the valve body, inlet joint, disc, gaskets, springs and so on. 
 Drainage pressure relief system is mainly composed of valve cover, diaphragm, valve core, gaskets, drain, spring, air baffle, etc. The outlet of air baffle must be connected to the drainage pipe network or sewer.


 Third, the working principle:
 Backflow prevention device is added in the secondary checkback system, a drainage pressure relief device, so that even if the secondary check seal at the same time damage, it can also play a role in preventing backflow pollution. Its working principle: 
 1. Normal water supply: 
 a. Clean municipal water from the first-class check-back system through the drain to the second-level check-back system to export water to users, the first-level check-in system to import high-pressure water into the drainage diaphragm Cavity, and the diaphragm under the cavity and the first stage check valve outlet (second stage check valve inlet) communicating, due to its existence of a certain pressure difference ΔP1 = 0.035MPa, pushing the valve flap down, drain closed, backflow preventer Normal water supply; 
 b. When the valve after the pipeline without users, water still. Such as the inlet pressure remains unchanged, there is pressure before and after the drain is still closed, such as the inlet pressure drops, the intermediate chamber and the valve differential pressure ΔP1 ≤ 0.022MPa, then the drainage control spring to open the spool, open the drain Allow the middle chamber to drain, keeping ΔP1 at 0.035 MPa. 
 
 2. seal failure: 
 a. Backflow preventer after the pipe network pressure rises above the valve inlet pressure, such as the second check valve seal intact, high-pressure water will not backflow, the diaphragm up and down to maintain the original pressure Poor, drain closed, no pressure relief. When the second check valve seal leak damage, the second check valve before the pressure increases, resulting in lower diaphragm pressure drop across the drain, drain open, drain pressure relief; this time, such as the first stop Check valve seal damage at the same time, as the second-stage check valve back to the high-pressure water has been decompression, it will not back to the first-class check valve. 
 b. When the valve pressure is higher than the pressure before the valve, such as water pressure continues to decline, the pressure on the diaphragm diaphragm pressure drop, the safety control valve to open the drainage spring drainage regulator drainage. When the inlet pressure drops to zero or negative pressure, the drain opens completely, the water is drained and the air enters the vacuum chamber through the drain to prevent siphon backflow.
 
 3. The valve opening pressure ≤ 0.07MPa, the specification provides in the range of 0.06 ~ 0.1MPa, inlet check valve working pressure is 0.035MPa. 
 
 The main shape and installation size:

Specification DN (mm)

Total length

Inlet and outlet pipe diameter (in)

Drainage pipe diameter (in)

Weight (kg)

DN15

169

1/2

1/2

1.2

DN20

172

3/4

1/2

1.4

DN25

236

1

1/2

3.5

DN32

321

11/4

3/4

7

DN40

321

11/2

3/4

7

DN50

321

2

1

10


主站蜘蛛池模板: 深夜福利国产精品亚洲尤物 | 日韩欧美一区二区三区不卡视频 | 男女男精品网站 | 尤物综合| 天天操夜夜爽 | 99爱视频99爱在线观看免费 | 精品成人在线视频 | 日韩在线视频不卡 | 女人国产香蕉久久精品 | 激情综合丝袜美女一区二区 | 久久亚洲精品中文字幕第一区 | 欧美性猛交ⅹxxx乱大交禽 | 在线观看日韩视频 | 欧美一级毛片免费高清aa | 久久精品国产91久久麻豆自制 | 2020久久精品永久免费 | 四虎影视精品永久免费网站 | 亚洲日本人成网站在线观看 | 无码免费一区二区三区免费播放 | 丁香六月天婷婷 | 日韩不卡毛片 | 日本人伦一区二区三区 | 日日夜夜天天 | 日本aaaa毛片在线看 | 亚洲综合在线观看一区www | 免费视频一区二区三区四区 | 波多野结衣在线播放视频 | 亚洲综合色婷婷中文字幕 | 天天夜夜骑 | 三区在线观看 | 久久久久久久久久久96av | 亚洲无线乱码高清在线观看一区 | 欧美成人免费在线观看 | 欲香欲色 | 免费黄网站在线观看 | 91精品国产综合久久婷婷 | 日日摸夜夜摸人人嗷嗷叫 | 躁逼| 自拍欧美 | 老色鬼久久综合第一 | 亚洲精品视频在线免费 |